Cush Wind Limited has submitted a planning application to Offaly County Council for the construction and operation of Cush Wind Farm Phase II, comprising a three-turbine extension to the permitted Cush Wind Farm Phase I, together with associated infrastructure and site development works, in the townlands of Galros East, Whigsborough, Ballycollin and Eglish, County Offaly.

​

This website provides access to the planning application documentation, including the Environmental Impact Assessment Report (EIAR), Natura Impact Statement (NIS), planning drawings and supporting reports submitted with the application.

PLANNING DOCUMENTS

1. Letter to Offaly County Council

2. Planning Statement

3. Site Notice

4. Newspaper Notice 

5. EIA Portal Notification

6. Consent Letters

PLANNING DRAWINGS

7. Planning Drawings

NATURA IMPACT STATEMENT

1. AASR and NIS

2. Appendix A to D

3. Appendix E to F

4. Appendix G to I

5. Appendix J to L

ENVIRONMENTAL IMPACT ASSESSMENT REPORT – VOLUME 1

EIAR Preface

Preface

Glossary of Terms

EIAR NTS

Non-Technical Summary

Chapter 1 Introduction

Chapter 2 Assessment of Project Alternatives

Chapter 3 Description of the Proposed Development

Chapter 4 Population & Human Health

Chapter 5 Biodiversity

Chapter 6 Land, Soils & Geology

Chapter 7 Water

Chapter 8 Air Quality 

Chapter 9 Climate

Chapter 10 Landscape

Chapter 11 Cultural Heritage

Chapter 12 Noise & Vibration

Chapter 13 Shadow Flicker

Chapter 14 Material Assets

Chapter 15 Interactions of Foregoing

ENVIRONMENTAL IMPACT ASSESSMENT REPORT – VOLUME 2

Annex 1.1 Scoping Report

Annex 1.2 Record of Pre-Planning Meeting

Annex 1.3 Request for Opinion of Unconfirmed Details

Annex 1.4 Record of Pre-Planning Meeting (Design Flexibility)

Annex 1.5 Planning Authority Opinion on Unconfirmed Details (Design Flexibility)

Annex 1.6 Sample Consultation Request Letter

Annex 1.7 Scoping Responses

Annex 1.8 Community Consultation Report

Annex 1.9 Schedule of Mitigation Measures

Annex 2.1 Alternative Grid Connection Options

Annex 2.2 Alternative Material Suppliers & Routes

Annex 3.1 Overall Project Location.

Annex 3.2 Project Layout Plan

Annex 3.3 Turbine Elevation Drawings

Annex 3.4 CEMP

Annex 3.5 Route Access Survey

Annex 3.6 Electrical Switch Room Building Compound Plan

Annex 3.7 Electrical Switch Room Building Elevations and Floor Plan

Annex 5.1 Biodiversity Figures

Annex 5.2 Biodiversity - Relevant Policy

Annex 5.3 Aquatic & Fisheries  Report

Annex 5.4 Designated Sites and Potential Pathways

Annex 5.5Site Synopses of Designated Sites

Annex 5.6 Baseline Bat Survey Report

Annex 5.7 - Habitat & Species Management Plan

Annex 5.8 - Baseline Bird Survey Reports

Annex 5.9 Aviation Collision Risk Report

Annex 5.10 - Desktop Study Data

Annex 5.11 - Marsh Fritillary Survey Report

ENVIRONMENTAL IMPACT ASSESSMENT REPORT – VOLUME 2 cont...

Annex 6.1 Peat Stability Report

Annex 6.2 BNM Draft Galros Bog Rehabilitation Plan 2026​​​

Annex 6.3 Trial Pit Logs 

Annex 7.1 Site Specific Flood Risk Assessment

Annex 7.2 Laboratory Reports

Annex 7.3 WFD Compliance Assessment

Annex 7.4 Water Constraints Map

Annex 10.1 Visual Assessment

Annex 10.2 Photomontage Imagery Pack Pt1​​​​​​​​​​​​​​​​​​​​

Annex 10.2 Photomontage Imagery Pack Pt2​​​​​​​​​​​​​​​​​​​​

Annex 10.2 Photomontage Imagery Pack Pt3​​​​​​​​​​​​​​​​​​​​

Annex 10.2 Photomontage Imagery Pack Pt4​​​​​​​​​​​​​​​​​​​​

Annex 10.2 Photomontage Imagery Pack Pt5​​​​​​​​​​​​​​​​​​​​

Annex 10.3 Comparative Photomontage Imagery Pack

Annex 11.1 Peatland Archaeology - Walkover Survey Report

Annex 11.2 Geophysical Survey Report

Annex 12.1 Glosary of Acoustic Terms

Annex 12.2 Model Parameters ​

Annex 12.3 Operational Noise Study Area​

Annex 12.4 Background Noise Survey

Annex 12.5 Sound Power Levels 

Annex 12.6 Predicted Noise Levels

Annex 12.7 Predicted Noise Contours

Annex 12.8 Cumulative Predicted Noise Levels

Annex 12.9 Cumulative Predicted Noise Contours

Annex 13.1 Dwellings Map

Annex 13.2 Project - Alone Shadow Flicker Modelling Results

Annex 13.3 Cumulative Shadow Flicker Modelling Results

Annex 13.4 Planning - Stage Shadow Flicker Monitoring Plan

Annex 14.1 Air Corps WF / Tall Structures Position Paper

Annex 14.2 Radio Telescope Impact Assess.

Annex 14.3 2rn Protocal Agreement