CushWind Farm Limited is applying for planning permission for the construction and operation of an 8-turbine wind farm and associated site development works in the townlands of Cush, Galros West, Boolinarig Big, Eglish, and Ballindown, County Offaly

Following consultations with An Bord Pleanála, it has been determined that the proposed development is a Strategic Infrastructure Development which necessitates a planning application being made directly to An Bord Pleanála. It is a requirement of An Bord Pleanála that a dedicated planning application website is created which includes all of the application documentation.

PLANNING DOCUMENTS

1. Letter to An Bord

Pleanala

2. Letter to Offaly County Council

3. Letters to Prescribed

Bodies

4. Planning Application

Form

5. Site Notice

6. Newspaper Notice 1

7. Newspaper Notice 2

8. EIA Portal Confirmation

Notice

9. Natura Impact 

Statement 

PLANNING DRAWINGS

10. Planning Drawings

ENVIRONMENTAL IMPACT ASSESSMENT REPORT – VOLUME 1

EIAR Preface

Preface

Chapter 1 Introduction

Chapter 2 Assessment of Project Alternatives

Chapter 3 Description of the Proposed Development

Chapter 4 Population & Human Health

Chapter 5 Biodiversity

Chapter 6 Land & Soil

Chapter 7 Water

Chapter 8 Air Quality & Climate

Chapter 9 Landscape

Chapter 10 Cultural Heritage

Chapter 11 Noise & Vibration

Chapter 12 Shadow Flicker

Chapter 13 Material Assets

Chapter 14 Interactions of Foregoing

Non-Technical Summary

EIAR NTS

ENVIRONMENTAL IMPACT ASSESSMENT REPORT – VOLUME 2

Annex 1.1 Scoping Report

Annex 1.2 Record of Meeting with An Bord Pleanála

Annex 1.3 SID Determination

Annex 1.4 Offaly County Council Scoping Response

Annex 1.5 Offaly County Council Meeting Minutes

Annex 1.6 Sample Consultation Request Letter

Annex 1.7 Scoping Responses

Annex 1.8 Community Consultation Report

Annex 1.9 Schedule of Mitigation Measures

Annex 2.1 Alternative Site Locations

Annex 2.2 Alternative Site Layouts

Annex 2.3 Alternative Grid Connections

Annex 2.4 Alternative Material Suppliers & Routes

Annex 2.5 Alternative Replant Lands

Annex 3.1 Overall Project Location.

Annex 3.2 Wnd Farm Site Layout

Annex 3.3 Turbine Elevation Drawing

Annex 3.4 CEMP

Annex 3.5 Route Access Survey

Annex 3.6 Electricity Substation and Grid Connection

Annex 3.7 Substation Compound Layout

Annex 3.8 - Felling Plan

Annex 5.1 Biodiversity Figures

Annex 5.2 Baseline Bird Survey Reports

Annex 5.3 Baseline Bat Report

Annex 5.4 Baseline Aquatic Ecology & Fisheries Survey Reports

Annex 5.5 annex 1 Survey Data

Annex 5.6 Desktop Study Data

Annex 5.7 - Avian Collision Risk Modelling

Annex 5.8 - Marsh Fritillary Survey Report

ENVIRONMENTAL IMPACT ASSESSMENT REPORT – VOLUME 2 cont...

Annex 6.1 Geotechnical Peat Stability Report

Annex 6.2 Trial Pit Logs

Annex 7.1 Flood Risk Assessment

Annex 7.2 Laboratory Report

Annex 7.3 WFD Compliance Assessment

Annex 8.1 Dust Minimisation Plan

Annex 9.1 Visual Assessment

Annex 9.2 Photomontages & ZTV

Annex 11.1 Glossary of Acoustic Terms

Annex 11.2 Noise Emmissions for Other Wind Farms

Annex 11.3 Noise Modelling Parameters

Annex 11.4 Noise Sensitive Locations Coordinates

Annex 11.5 Calibration Certificates

Annex 11.6 Predicted Noise Levels

Annex 11.7 Noise Contours

Annex 11.8 Cumulative Predicted Noise Levels

Annex 11.9 Cumulative Noise Contours

Annex 11.10 Outline Noise Monitoring Program

Annex 12.1 Dwellings Map

Annex 12.2 Shadow Flicker Prediction Model

Annex 12.3 Cumulative Shadow Flicker Prediction

Annex 12.4 Outline Shadow Flicker Monitoring Programme

Annex 13.1 Road Safety Audit

Annex 13.2 Air Corps Position Paper

Annex 13.3 Radio Telescope Impact Assessment

Annex 13.4 2rn Protocal